Beech Street Gate Installation

The vehicle and pedestrian gate on Beech Street will be in operation within the next couple of weeks. Please note, guests will no longer be able to enter visitor parking without a fob. The Board will be looking into options for keypad access at each garage entry at the next meeting.

Palermo Halloween Party

It’s Halloween time, we’re having a bash on Saturday, October 26th at 5:30pm! Wear your best costume and bring your spooktacular pre-carved pumpkin for our Halloween Party/Movie Night!

6:00pm: Charlie Brown Halloween Movie
6:30pm: Costume Contest
7:30pm: Hocus Pocus Movie
9:15pm: Pre-carved pumpkin contest winner announced

There will be prizes! Details were sent out via email.

Main Line Drain Jetting-October

Drain jetting is tentatively scheduled week of October 21st. Parking spaces that have drains located either directly above or around the vicinity of the space(s) must be vacant for accessibility to the drains. A list of parking spaces that will be affected is posted on the bulletin by the gym. Unmoved vehicles will be towed at the vehicle owner’s expense.

Move Policy Revisions

The following are proposed changes to the move policy that will be on the agenda for the Board to adopt at the Board meeting on August 28th.

• Deposit required for move-outs only. Not required for move-ins. Owner/agent must submit the deposit for move-outs.

• Move fee increased from $150.00 to $175.00. Over time rates will remain at $35/hour.

Upcoming Building Maintenance-UPDATED

Boiler Replacements:
The boilers servicing buildings 2 & 3 will be replaced on July 24th and 25th. Day one will require shutdown of both hot and cold water in the entire building (all 230 units) between 8am and 5pm. Day two will only require shutdown of just hot water in building 3 between 8am and 5pm. Units in building 3 are listed on the bulletin by the gym.

An update will be sent to those on the email distribution list if water is restored sooner.


Annual Fire Alarm & Sprinkler Inspections & Fire Panel Upgrade:
The building’s fire panel is getting replaced with an upgraded model. The upgrade requires City approval. The City requires access in units for pre-inspection and final inspection. In addition, the fire marshal is strictly enforcing fire codes that mandate inspection of the fire sprinkler heads and audible devices in units. This is planned for July. Click here for details including dates that unit access is required.

Location

1501 Front Street
San Diego, CA 92101
phone | (619) 786-7497

Management Team

Manager
Justin Goodman | jgoodman@actionlife.com

Assistant Manager
Jai Swinton | jaiswinton@actionlife.com

Management Company

Action Property Management
Regional Office
750 B Street, Suite 2860
San Diego, CA 92101
phone | 949-450-0202

Corporate Office
2603 Main Street, Suite 500
Irvine, CA 92614
phone | 949-450-0202
fax | 949-450-0303