Emergency Building Water Shut Down
Palermo Residents,
An emergency building wide water shut down is required immediately. There is a leak in the domestic water booster pump that requires immediate repairs. The repairs are estimated to take approximately 2 hours. We will update everyone as soon as the repairs are complete, and water is restored. Thank you for your understanding with this building emergency.
