Please be advised that a full water shut down is required for Building 1 on Tuesday, February 6, 2024. The water is expected to be shut off from 9:00 am to 2:00 pm for necessary boiler repairs.
The following units will be affected by the water shut off:
First Floor: 101, 115, 116, 117, 118
Second Floor: 201, 202, 222, 223, 224, 225, 226, 227, 229, 230
Third Floor: 301, 302, 322, 323, 324, 325, 326, 327, 329, 330
Fourth Floor: 401, 402, 403, 421, 422, 423, 424, 425, 426, 427, 428, 429, 430
Fifth Floor: 501, 502, 503, 521, 522, 523, 524, 526, 527, 529, 530
Sixth Floor: 601, 602, 622, 623, 624, 626, 627, 629, 630